TOWER BRIDGE COURT

Tower Bridge Court, located on the south side of the River Thames with views of the iconic Tower Bridge, is being remodelled and expanded for its new use.

Toureen commenced works on site in summer 2022, including the removal of rooftop plant rooms and substantial mechanical and electrical equipment. In parallel, major temporary works and back-propping measures were implemented to stabilise the structure ahead of the required cut-and-carve operations.

The works are carried out using a modern fleet of demolition plant powered by HVO fuel, alongside robotic demolition machines, helping to minimise the project’s carbon footprint. A 99% recycling rate is also targeted for all materials removed from site, supporting strong sustainability outcomes.

Client: Willmott Dixon