Toureen successfully delivered the redevelopment of Costco’s Sunbury site into a high-capacity petrol filling station, transforming a challenging brownfield site into one of the largest-capacity forecourts in the UK outside motorway service areas.

The project involved demolishing the existing 81m x 46m warehouse and extensive hardstanding, including the safe removal of significant asbestos-containing materials and an existing electrical substation.

A key challenge was the site’s exceptionally high groundwater level. Toureen developed an innovative solution, designing and installing a concrete underground vault to accommodate five 100,000-litre fuel tanks, providing a total storage capacity of 500,000 litres and enabling 32 vehicles to refuel simultaneously.

The project showcased Toureen’s ability to overcome complex site constraints and deliver a major, high-capacity facility for Costco.

Client: Costco