Client
Walter Lilly
Date of completion
November 2016
Value
£7m
Full Case Study Download
![RC basement and Façade Retention](/sites/default/files/styles/hero_small/public/2018-03/MHS%20image.jpg?itok=lvjHwUIU)
![RC basement and Façade Retention](/sites/default/files/styles/800x800/public/2018-03/CB%20MHS%200081.jpg?itok=Q6sHGAlI)
Scope of works
-
Façade retention
-
Demolition
-
Temporary works
-
Piling
-
Reinforced concrete basement
![RC basement and Façade Retention](/sites/default/files/styles/800x800/public/2018-03/TG%20MHS%203396.jpg?itok=c0UlyeMC)
Project key points
-
Six-storey demolition whilst retaining the front façade
-
High detail separation to bonded concrete beams to the adjoining party wall at two levels
-
Design and installation of all temporary works schemes, including seven-storey façade retention, temporary structural steel propping and piles to existing columns and sheet piling to form new basement
-
Excavation of two-storey basement to be 6.9m deep from existing finish floor level using sheet piles varying from 7m to 11m deep
-
Proposed design to the client to reduce the basement raft to offer saving and to avoid the underpinning scheme being affected by the ground water level
-
Construction of nine-stories of in-situ reinforced concrete frame above a double basement on a restricted city site
-
Protection and weatherproofing of a live basement substation
Contact Toureen Group
If you are looking for a contractor to undertake reinforced concrete basement construction, demolition or façade retention, please get in touch with us using the details on our contact page.