WHITTINGTON HOSPITAL

Following the demolition of the existing Whittington Education Centre (WEC) and the existing staff flats on the Whittington Hospital campus, Toureen are building a new 4 storey 78 bed mental health inpatient facility.

Our scope of works (including the demolition), consists of site clearing and piling enabling works, perimeter sheet piling, CFA piling attendance (both contig and bearing piles), ground works (including basement excavation and earthworks support propping) and construction of the reinforced concrete substructure and superstructure frame.

Client: Camden & Islington NHS Foundation Trust

Main Contractor: BAM

Completion Date: 2024